Production Floor Board Wireframe

Car-seat-cover production · one card = one sales-order item line · tick cards to move several at once
Today · Wed 17 Jun 2026
RM
ERP Txn 1
Sales Order
↓ Pending orders imported daily (read-only).
Pending Order Items
ERP Txn 2
Production Order
⚡ Plan production — one PO created, later steps released on the same PO.
Cutting · PlannedStitching · Planned
ERP Txn 3
Production Reporting
⚡ Report each step done against the PO (qty · scrap · who · when).
Cutting · DoneStitching · DoneFinal Item Produced
ERP Txn 4
Dispatch Plan / Note
⚡ Create dispatch note — inventory synced back to ERP.
Dispatch Note Created
🔎
RUSH only Due soon / overdue
Tick cards to batch-move, or drag a single card
0 cards selected Move all to
💡 Try it: tick the checkboxes on several cards, then use “Move together →” to advance them in one batch — or drag a single card. Either way a side panel shows exactly which ERP transaction posts (Sales Order → Production Order → Production Reporting → Dispatch). Click a card body to open its detail. Static prototype — no live ERP writes occur.
Could not load the Syncfusion Kanban from CDN.
This wireframe needs internet access to cdn.syncfusion.com. Open it on a connected machine, or self-host ej2.min.js + tailwind.css (v25.1.35) and update the two tags in <head>.
Legend & how the board maps to your ERP
Wireframe / clickable prototype · Syncfusion EJ2 Kanban v25.1.35 · sample data · drag-drop & confirm panels are simulated.